TAI Administrative Building & Guardhouse Renovation



CLIENT: TAI TUSAŞ

PLACE: Ankara

PROJECT DATE: 2011

 

CONSTRUCTION AREA: 12.000 m2

 

 

The building dated early 80’s is renovated in accord with the current technical specifications. Of the 6 blocks, 4 of them is renovated faithful to the original facade, 2 blocks which house the engineers offices are totally reinterpreted in terms of shell design due to the current user demands. At the main entrance of the building a conopy symbolsing air foil and a statue are added.  At the main entrance of the campus, the guard house and the canopy is renovated through a new functional  layout and materials. New symbolic elements are added to emphasize the main welcoming area.

 

Exhibitions

Gazi University Faculty of Architecture – Koleksiyon – TSMD Host Architects  - 18 / TÇMT (2016)

Koleksiyon-TSMD Host Architects  – 33 / TÇMT (2015)