CLIENT: GIPTA Co.
PLACE: Ankara
PROJECT DATE: 2006
CONSTRUCTION DATE: 2007
CONSTRUCTION AREA: 16.000 m2
Heading to a leader position in paper industry 2nd phase buildings are designed for Gıpta. Showroom, vip, stores, waste and treatment units are added with a doubled production area. The facade from the 1st phased evolved to a tripartite industrial shell. The shell; is a definer for traffic flow, a regulator of air and heat and an equipment for technical services at each level. It is an eco-friend building by its energy saving and waste treatment properties with 10 decare landscape area.
Publications
UCTEA Chamber of Architects l 11th National Architectural Exhibition and Awards Book (2008)
Exhibitions
Gazi University Faculty of Architecture – Koleksiyon – TSMD Host Architects - 18 / TÇMT (2016)
Koleksiyon-TSMD Host Architects – 33 / TÇMT (2015)
UCTEA Chamber of Architects l 11th National Architectural Exhibition and Awards (2008)